Tuesday, September 3, 2013

National Association of Clean Water Agencies v. U.S. - EPA & Other Cases

Aug 20: In the U.S. Court of Appeals, D.C. Circuit, Case No. 11-1131. The Appeals Court explains that in March 2011, U.S. EPA issued a final rule establishing emission standards for sewage sludge incinerators under § 129 of the Clean Air Act, 42 U.S.C. § 7429. See Standards of Performance for New Stationary Sources and Emission Guidelines for Existing Sources: Sewage Sludge Incineration Units, 76 Fed. Reg. 15,372 (Mar. 21, 2011). Determining that sewage sludge incinerators were "solid waste incineration unit[s]" as defined in § 129(g)(1), EPA promulgated "maximum achievable control technology" (MACT) standards for two subcategories of sewage sludge incinerators [See WIMS 1/21/11].
 
    The Appeals states, "The Clean Air Act cabins EPA's discretion in setting MACT standards, requiring EPA to base the standards on the emissions achieved by the best-performing existing incinerators. See 42 U.S.C. § 7429(a)(2). But acting under pressure of a court order to establish the MACT standards by a set deadline, EPA took a targeted approach to collecting emissions data and used several different methods to estimate the emissions levels achieved by existing incinerators. See 76 Fed. Reg. at 15,386.
 
    The petitioners challenge several different aspects of the rulemaking. Petitioners National Association of Clean Water Agencies and Hatfield Township Municipal Authority (collectively, NACWA) challenge EPA's authority to regulate sewage sludge incinerators under §129, asserting that sewage sludge incinerators do not fall within the scope of § 129(g)(1)'s definition of 'solid waste incineration unit.'"
 
    Petitioners NACWA and Sierra Club seek review of the sewage sludge incinerator emission standards, challenging several aspects of EPA's methodology for estimating the emission levels achieved by the best performing units. In addition to these petitioners, MaxWest Environmental Systems, developer of a proprietary biosolids management process, intervenes to challenge EPA's treatment of its
technology in the sewage sludge incinerator rule.
 
    The Appeals rules, ". . .we deny NACWA's petition for review as to EPA's authority to regulate sewage sludge incinerators under §129. As to the petitioners' challenges to EPA's methodology in setting emission standards, we agree that in some respects EPA has not adequately established that its estimations are reasonable, and so remand parts of the sewage sludge incinerator rule to EPA for further proceedings without vacating the current standards. We otherwise deny the petitions for review, and will not consider intervenor MaxWest's arguments as they are not within the scope of issues raised by the petitioners."
 
    The Appeals Court notes in the opinion that in the final rule, EPA candidly noted that its MACT floor methodology -- including the emissions testing dataset from less than 12 percent of incinerators -- was motivated in part by the impending court-ordered deadline to establish emission standards. EPA explained that "given the court-ordered deadline for EPA to issue the final [sewage sludge incinerator] rule, it was not possible to undertake the time-consuming process of sending an [information collection request] to all the affected [sewage sludge incinerators] consistent with the requirements of the [Paperwork Reduction Act]."
 
    The Appeals Court explains, "while both NACWA's and Sierra Club's arguments on this point share a similar element -- EPA's alleged failure to account for sewage sludge variability makes its MACT floor methodology arbitrary and capricious -- Sierra Club focuses on EPA's assumption about control technology installed on the incinerator, while NACWA focuses on EPA's assumptions about the effect of sewage sludge characteristics on emission levels." The Appeals Court addresses the concerns separately.
 
    The Appeals Court concludes, ". . .we remand to EPA portions of its rule for further explanation without vacating the current MACT standards. Specifically, we direct EPA to clarify why its Clean Water Act Part 503 regulations control for other non-technology factors. We also direct EPA to clarify issues related to its upper prediction limit and variability analysis. In particular, EPA should explain why the upper prediction
limit represents the "average emissions limitation achieved by the best performing 12 percent of" incinerators; why the upper prediction limit reasonably estimates the worst foreseeable operating conditions; and why the upper prediction limit can account for more than intra-unit variability, as EPA claimed it could on petition for review. Finally, we direct EPA to elaborate on how it can use a statistical method to determine whether a limited dataset is representative of incinerators for which it has no data, and to explain why it chose the variables it did for that statistical analysis.
 
    In all other respects, we uphold EPA's rule against the petitioners' challenges. Because the issues MaxWest raised in its intervenor brief are outside the scope raised by the petitioners, we do not consider its arguments."
 
    Access the complete opinion (click here). [#Air, #Water, #CADC]
 
Quick Summaries Of  Additional Cases During The Break
  • Anderson Brothers, Inc. v. St. Paul Fire and Marine Insurance Co. - Aug 30: In the U.S. Court of Appeals, Ninth Circuit, Case No. 12-35454. Appealed from the United States District Court for the District of Oregon. The panel affirmed the district court's judgment in favor of an insured, holding that the insurer breached its duty to defend when it refused to provide a defense after the insured received letters from the Environmental Protection Agency, notifying the insured of its potential liability under the Comprehensive Environmental Response, Compensation, and Liability Act for environmental contamination of the Portland Harbor Superfund Site. Access the complete opinion (click here). [#Remed, #CA9]

  • Northwest Environmental Defense Center v. Brown - Aug 30: In the U.S. Court of Appeals, Ninth Circuit, Case No. 07-35266. On Remand From The United States Supreme Court [See WIMS 3/21/13]. The Appeals Court said, "The Court left intact our holding that "when stormwater runoff is collected in a system of ditches, culverts, and channels and is then discharged into a stream or river, there is a 'discernable, confined and discrete conveyance' of pollutants, and there is therefore a discharge from a point source" within the meaning of the Clean Water Act's basic definition of a point source in 33 U.S.C. § 1362(14). Brown, 640 F.3d at 1070–71; see Decker, 133 S. Ct. at 1338. . . We vacate the decision of the district court and remand to that court for proceedings consistent with the Supreme Court's opinion."  Access the complete opinion (click here). [#Water, #CA9]

  • In Re: Deepwater Horizon - Aug 29: In the U.S. Court of Appeals, Firth Circuit, Case No. 12-30230. Appealed from the United States District Court for the Eastern District of Louisiana. The original opinion in this case was filed on March 1, 2013.1 Because this case involves important and determinative questions of Texas law as to which there is no controlling Texas Supreme Court precedent, the panel, upon the petition for rehearing, unanimously withdraws the previous opinion and substitutes the [specified] certified questions to the Supreme Court of Texas." Access the complete opinion (click here). [#Energy/OilSpill] 

  • Land O'Lakes, Inc.  v.  Employers Insurance Company - Aug 29: In the U.S. Court of Appeals, Eighth Circuit, Case No. 12-1752. Appealed from the U.S. District Court for the District of Minnesota - Minneapolis. The Appeals Court ruled that the district court did not err in concluding that a letter the U.S. EPA sent the insured in 2011 informing it that the EPA considered it a Potentially Responsible Party in connection with an environmental cleanup constituted a suit for purposes of determining whether the insured's breach of contract action against the insurer was barred by the applicable statute of limitations; the insured's costs to remediate the site fall within the "owned-property" exclusion in the policy at issue. Access the complete opinion (click here). [#Remed] 

  • Chinatown Neighborhood Association v. State of California - Aug 27: In the U.S. Court of Appeals, Ninth Circuit, Case No. 13-15188, unpublished opinion. Appealed from the United States District Court for the Northern District of California. The Appeals Court upheld the district court's denial of a preliminary injunction against the enforcement of sections 2021 and 2021.5 of the California Fish and Game Code (the Shark Fin Law). Subject to certain exceptions, the Shark Fin Law makes it "unlawful for any person to possess, sell, offer for sale, trade, or distribute a shark fin" in California. Access the complete opinion (click here). [#Wildlife]

  • More Summaries - Subscribers Note: There were additional U.S. Appeals Court cases during the break. WIMS will include more summaries in tomorrow's report.

Monday, August 26, 2013

Subscribers & Readers Notice

Subscribers & Readers Notice:
 
WIMS is on our late Summer publication break continuing through Labor Day. We will resume publication on Tuesday, September 3, 2013.

Friday, August 16, 2013

Alaska Wilderness League v. U.S. EPA

Aug 15: In the U.S. Court of Appeals, Ninth Circuit, Case No. 12-71506. On Petition for Review of an Order of the U.S. EPA Environmental Appeals Board. In its summary of the opinion the Appeals Court indicates, "42 U.S.C. § 7661c(e) is ambiguous as to whether 'increment' requirements are 'applicable' to a temporary source like Shell Offshore, Inc.'s (Shell) drill vessel Kulluk. Accordingly, we defer to the EPA Environmental Appeals Board's (EAB) reasonable interpretation of § 7661c(e). See Chevron U.S.A. Inc. v. Natural Res. Def. Council, Inc., 467 U.S. 837 (1984). The EAB reasonably concluded that Shell need not analyze the Kulluk's potential impact on increment before obtaining an oil exploration permit. We also deny the petition for review of the Environmental Protection Agency's (EPA) exemption of a 500-meter radius surrounding the Kulluk from ambient air quality standards, because the decision was 'a permissible application of the EPA's regulations.' See Resisting Envtl. Destruction on Indigenous Lands, REDOIL v. EPA, 716 F.3d 1155, 1158, 1160–61 (9th Cir. 2013)."
 
    To comply with Title V of the Clean Air Act, Shell sought and obtained three related permits in 2011. At Shell's request, the EPA subsequently consolidated the permits into one permitting document (the Permit). The Permit allows Shell to construct, operate, and conduct "pollutant emitting activities" associated with the Kulluk in the Beaufort Sea off Alaska's
North Slope. Before issuing the Permit, the EPA released a Statement of Basis. The Statement of Basis provided that the EPA would not require Shell to analyze the effect its emissions would have on the "increment for the Kulluk's area of operation." EPA concluded that increment analysis was unnecessary, because, under § 7661c(e) and the other relevant statutes, no increment requirements were "applicable" to the Kulluk.
 
    Alaska Wilderness raised the increment and ambient air issues, among others, in its challenge of the Permit before the EAB. Alaska Wilderness contended that the EPA misinterpreted "applicable increment" under § 7661c(e). Alaska Wilderness argued that EPA's "source-based" interpretation erred by applying increment standards to temporary sources only if the PSD would impose increment standards on a similar stationary source. Alaska Wilderness maintained a "geography based" interpretation -- that increment requirements are "applicable" to all sources any time they are established for the geographic area. Alaska Wilderness also argued that the "ambient air" exemption was inconsistent with the Costle Letter, because Shell did not own and could not, by physical barrier, exclude the public from accessing the space. In a 100-page decision (the EAB Decision), the EAB rejected both challenges.
 
    The Appeals Court rules, "As a threshold matter, we reject Alaska Wilderness's argument that the EAB Decision is not entitled to Chevron deference. . . Section 7661c(e) is ambiguous, and the EPA's interpretation is reasonable under the applicable statutes' plain language. Thus, we owe Chevron deference to the EAB Decision not to require a preconstruction increment analysis for the Kulluk. Similarly, as we held in REDOIL, the EPA permissibly granted a 500-meter exemption to the Kulluk from "ambient air" standards. Petition denied."
 
    Access the complete opinion (click here). [#Air, #CA9]
 

Thursday, August 15, 2013

Entergy Nuclear Vermont Yankee, LLC v. Gov. Shumlin

Aug 14: In the U.S. Court of Appeals, Second Circuit, Case No. 12-707. Appealed from U.S. District Court for the District of Vermont. A summary indicates that the owners of the nuclear power plant brought action against officials of the State of Vermont, seeking a declaratory judgment and permanent injunction that three Vermont statutes are preempted by the Atomic Energy Act, and that Vermont's efforts to require a below-market power purchase agreement is preempted by the Federal Power Act and violates the dormant Commerce Clause. Following a bench trial, the United States District Court for the District of Vermont ruled in plaintiffs' favor on the Atomic Energy Act preemption claim and the dormant Commerce Clause claim, and found that the Federal Power Act preemption claim was not ripe. The Appeals Court affirmed We the district court as to the Atomic Energy Act and Federal Power Act preemption claims, and reversed the district court as to the dormant Commerce Clause claim. One Judge issued a separate and "reluctantly" concurring opinion.
 
    Without getting into the complete details, at the heart of the litigation are two relatively new Vermont laws which would have limited or prohibited the continued operation of the Vermont Yankee nuclear power plant. Act 74, which was enacted on June 21, 2005, had two principal effects. First, Entergy would only need to seek a "certificate of public good" (CPG) from the Board before constructing storage facilities for new spent nuclear fuel, rather than the Vermont Legislature as had been required by section 6501(a). However, the CPG would remain in effect only until March 21, 2012. The second effect of Act 7 74 was that after March 21, 2012, the storage of any new spent nuclear fuel in Vermont would require an affirmative vote by the Vermont Legislature. If no such affirmative vote occurred, storage of nuclear waste generated from operations after March 21, 2012, would not be permitted. Thus, Vermont Yankee would have to shut down. Act 160 was passed on May 18, 2006, and provides that "a nuclear energy generating plant may be operated in Vermont only with the explicit approval of the General Assembly."
 
    In its conclusion the Appeals Court said, ". . .we affirm the district court's grant of a declaratory judgment that Act 74 and Act 160 are facially preempted by the Atomic Energy Act. We reverse the district court's determination that Vermont's efforts to condition a new Certificate of Public Good for Vermont Yankee on the execution of a favorable power purchase agreement violate the dormant Commerce Clause. We affirm the district court's determination that Entergy's challenge under the Federal Power Act is unripe. We affirm the district court's grant of a permanent injunction enjoining the defendants from enforcing sections 6522(c)(2) or 6522(c)(4) in title 10 of the Vermont Statutes, as enacted by Act 74, or sections 248(e)(2), 248(m), or 254 in title 30 of the Vermont Statutes, as enacted by Act 160. Finally, we vacate the district court's permanent injunction enjoining the defendants from conditioning the issuance of a Certificate of Public Good on the execution of a below-wholesale-market power purchase agreement between Entergy and Vermont utilities or otherwise requiring Vermont Yankee to sell power to Vermont utilities at preferential rates."
 
    Judge Susan Carney issued a separate concurring opinion stating in part, "I concur, reluctantly, in the majority's detailed and carefully reasoned opinion striking down Vermont Acts 74 and 160. My reluctance stems not from any flaw in the majority's analysis, but rather from my concern that Congress, in enacting the Atomic Energy Act (AEA), did not intend the result we reach. Rather, we are led to our conclusion principally by an expansive gloss on the preemptive scope of the AEA first set forth in Pacific Gas & Electric Co. v. State Energy Resources Conservation & Development Commission, 461 U.S. 190 (1983) (Pacific Gas). There, the Supreme Court instructed that '[a] state moratorium on nuclear construction grounded in safety concerns falls squarely within the prohibited field' and would therefore be preempted. Id. at 213 (emphasis added)."
 
    Access the complete opinion and concurrence (click here). [#Energy/Nuclear, #CA2]

Tuesday, August 13, 2013

In Re: Aiken County (Yucca Mountain Case)

Aug 13: In the U.S. Court of Appeals, D.C. Circuit, Case No. 11-1271. On Petition for Writ of Mandamus. In this split decision, the Majority explains that this case raises significant questions about the scope of the Executive's authority to disregard Federal statutes. The case arises out of a longstanding dispute about nuclear waste storage at Yucca Mountain in Nevada. Petitioners include the States of South Carolina and Washington, as well as entities and individuals in those States. Nuclear waste is currently stored in those States in the absence of a long-term storage site such as Yucca Mountain.
 
    The Majority says, "The underlying policy debate is not our concern. The policy is for Congress and the President to establish as they see fit in enacting statutes, and for the President and subordinate executive agencies (as well as relevant independent agencies such as the Nuclear Regulatory Commission) to implement within statutory boundaries. Our more modest task is to ensure, in justiciable cases, that agencies comply with the law as it has been set by Congress. Here, the Nuclear Regulatory Commission has continued to violate the law governing the Yucca Mountain licensing process. We therefore grant the petition for a writ of mandamus."
 
    The Majority reminds that the Nuclear Waste Policy Act, which was passed by Congress and then signed by President Reagan in 1983, provides that the Nuclear Regulatory Commission "shall consider" the Department of Energy's license application to store nuclear waste at Yucca Mountain and "shall issue a final decision approving or disapproving" the application within three years of its submission. 42  U.S.C. § 10134(d). The statute allows the Commission to extend the deadline by an additional year if it issues a written report explaining the reason for the delay and providing the estimated time for completion. Id. § 10134(d), (e)(2).
 
    The Majority indicates that, ". . .the statutory deadline for the Commission to complete the licensing process and approve or disapprove the Department of Energy's application has long since passed. Yet the Commission still has not issued the decision required by statute. Indeed, by its own admission, the Commission has no current intention of complying with the law. Rather, the Commission has simply shut down its review and consideration of the Department of Energy's license application."
 
    The Majority concludes, "At the behest of the Commission, we have repeatedly gone out of our way over the last several years to defer a mandamus order against the Commission and thereby give Congress time to pass new legislation that would clarify this matter if it so wished. In our decision in August 2012, the Court's majority made clear, however, that mandamus likely would have to be granted at some point if Congress took no further action. See Order, In re Aiken County, No. 11-1271 (D.C. Cir. Aug. 3, 2012). Since then, Congress has taken no further action on this matter. At this point, the Commission is simply defying a law enacted by Congress, and the Commission is doing so without any legal basis.
 
    "We therefore have no good choice but to grant the petition for a writ of mandamus against the Commission. This case has serious implications for our constitutional structure. It is no overstatement to say that our constitutional system of separation of powers would be significantly altered if we were to allow executive and independent agencies to disregard federal law in the manner asserted in this case by the Nuclear Regulatory Commission. Our decision today rests on the constitutional authority of Congress, and the respect that the Executive and the Judiciary properly owe to Congress in the circumstances here. To be sure, if Congress determines in the wake of our decision that it will never fund the Commission's licensing process to completion, we would certainly hope that Congress would step in before the current $11.1 million is expended, so as to avoid wasting that taxpayer money. And Congress, of course, is under no obligation to appropriate additional money for the Yucca Mountain project. Moreover, our decision here does not prejudge the merits of the Commission's consideration or decision on the Department of Energy's license application, or the Commission's consideration or decision on any Department of Energy attempt to withdraw the license application. But unless and until Congress authoritatively says otherwise or there are no appropriated funds remaining, the Nuclear Regulatory Commission must promptly continue with the legally mandated licensing process. The petition for a writ of mandamus is granted."
 
    Chief Judge Garland issued a dissenting opinion stating in part, "Mandamus is a 'drastic and extraordinary remedy reserved for really extraordinary causes.' Cheney v. U.S. Dist. Court for the Dist. of Columbia, 542 U.S. 367, 380 (2004) (internal quotation marks omitted). Even if a petitioner can show that it has a 'clear and indisputable' right to the writ, issuing the writ remains 'a matter vested in the discretion of the court.' Id. at 381, 391. Likewise, 'mandamus does not necessarily follow a finding of a [statutory] violation.' In re United Mine Workers of Am. Int'l Union, 190 F.3d 545, 551 (D.C. Cir. 1999) (second alteration in original) (quoting In re Barr Labs., Inc., 930 F.2d 72, 74 (D.C.Cir. 1991)). To the contrary, this court has not hesitated to deny the writ even when an agency has missed a statutory deadline by far more than the two years that have passed in this case. See id. at 546, 551 (declining to issue the writ, notwithstanding that the agency missed an 'express' statutory deadline by 8 years in 'clear violation' of the statute). Finally, and most relevant here, '[c]ourts will not issue the writ to do a useless thing, even though technically to uphold a legal right.' United States ex rel. Sierra Land & Water Co. v. Ickes, 84 F.2d 228, 232 (D.C. Cir. 1936).
 
    "Unfortunately, granting the writ in this case will indeed direct the Nuclear Regulatory Commission to do 'a useless thing.' The NRC has not refused to proceed with the Yucca Mountain application. Rather, by unanimous votes of both the Commission and its Atomic Safety and Licensing Board, it has suspended the application proceeding until there are sufficient funds to make meaningful progress. . . " Judge Garland explains that Congress has refused to provide adequate funding to pursue the project and it has been packed up and dismantled. He concludes his dissent, "In short, given the limited funds that remain available, issuing a writ of mandamus amounts to little more than ordering the Commission to spend part of those funds unpacking its boxes, and the remainder packing them up again. This exercise will do nothing to safeguard the separation of powers, which my colleagues see as imperiled by the NRC's conduct. . . And because '[i]t is within our discretion not to order the doing of a useless act,' Sierra Land & Water, 84 F.2d at 232, I respectfully dissent."
 
       Energy and Commerce Committee Chairman Fred Upton (R-MI) and Environment and the Economy Subcommittee Chairman John Shimkus (R-IL) issued a statement welcoming the court's decision, which they said "affirms that the NRC has the statutory duty to complete the license review using the funds appropriated by Congress." They said, "We welcome this long-awaited decision. Today's action by the court is a significant milestone for Yucca Mountain and a clear rebuke of the Nuclear Regulatory Commission's failure to implement the Nuclear Waste Policy Act. The Obama administration rejected the law and prematurely terminated the Yucca Mountain repository program, but Congress and the courts have spoken out to prevent billions of taxpayer dollars and three decades of research from being squandered. Last month, 335 House members, including the majority of Democrats, voted to boost funding for the license review in the energy and water appropriations bill.

    "Our great system of checks and balances will ensure the law is carried out, and we will soon know once and for all whether Yucca Mountain is safe. Ultimately, our goal continues to be the safe permanent storage of spent nuclear fuel, giving states and communities the certainty they need. This decision will help re-start the important work toward a resolution. We will continue our oversight of the Commission to ensure the license review is swiftly resumed and the NRC's independent, technical conclusions about the safety of Yucca Mountain are made available to the public. Let the science be the deciding factor on Yucca Mountain, not politics."
 
    Christopher Guith, vice president of policy at the U.S. Chamber's Institute for 21st Century Energy, issued a statement saying, "Today's ruling by the D.C. Circuit Court has reaffirmed what Congress determined long ago, but that the Executive Branch has been attempting to undermine. The Nuclear Waste Policy Act explicitly set out the nation's nuclear waste plan nearly 30 years ago. The Court's ruling reminds us that until the law is changed, Yucca Mountain is the nation's used fuel and nuclear waste repository. It's time for the NRC to implement the law of the land."
 
    Access the complete opinion and dissent and a separate concurrence (click here). Access the statement from Reps. Upton & Shimkus (click here). Access the U.S. Chamber statement (click here). [#Haz/Nuclear, #CADC]

Monday, August 12, 2013

Greg Herden v. United States

Aug 9: In the U.S. Court of Appeals, Eighth Circuit, Case No. 11-3530. Appealed from United States District Court for the District of Minnesota in Minneapolis. In an split, en banc decision, the Appeals Court explains that Greg Herden, Roger Herden, and Garrett Herden (the Herdens) sued the United States under the Federal Tort Claims Act (FTCA), 28 U.S.C. §§ 1346, 2671-80. They alleged their cattle operation suffered damage because of a seed mixture an employee of the United States Department of Agriculture (USDA) directed them to plant on their land. The district court dismissed the Herdens' claims, concluding the Federal employee's conduct fell within the FTCA's discretionary-function exception. The Appeals Court indicates that, "After a divided panel of this court reversed the district court, the en banc court granted the government's petition for rehearing. We now affirm the district court."
 
    The case involves the Herdens who operate a three-generation cattle farm in northern Minnesota. In May 2004, the Herdens chose to participate in the Environmental Quality Incentives Program (EQIP). EQIP is a program run by the USDA through the Natural Resource Conservation Service (NRCS). In this case, the Herdens agreed to plant a mix of grasses and legumes on some of their pasture lands, and the government agreed to reimburse the Herdens 90% of the costs associated with planting the seed mixture chosen by the NRCS. In Minnesota, William Hunt served as the NRCS's State Conservationist. Hunt delegated seed mixture planting decisions to his staff, including State Grazing Specialist Howard Moechnig. Moechnig was the particular staff member who visited the Herdens' ranch to select a seed mixture.

    After Moechnig chose the seed mixture for the pasture in Section 11, Greg Herden said he complained to Moechnig about the high amount of Alsike Clover in the mixture because the clover can create toxic hay for cattle. Moechnig does not recall Herden complaining about Alsike Clover toxicity, but does remember Herden asking for permission to plant a mix containing alfalfa. Moechnig denied permission to plant an alfalfa mix, explaining that alfalfa is hard to establish on wet soils and therefore would neither meet NRCS's environmental goals nor be a good investment for the government. The Herdens chose to comply with Moechnig's seed mixture decision because failure to do so would have resulted in losing the federal funding under EQIP.
 
    The Herdens claim toxic hay began to injure their cattle in the spring of 2007. Several calves were stillborn, and others died shortly after birth. Adult cattle also died. The Herdens attribute the illnesses and deaths of their cattle to the Alsike Clover in the hay harvested from the Section 11 pasture. They claim the losses to their cattle herd have virtually destroyed their multi-generational farming operation. The NRCS contests the Herdens' claims and instead believes mold in improperly stored hay caused the problems with the cattle herd.

    The Majority reasoned that, "On one hand, the Herdens believed a seed mixture containing alfalfa would have better advanced the statutory goal of agricultural production, as well as one of Code 512's stated purposes of improving or maintaining livestock nutrition and/or health. On the other hand, Moechnig believed a seed mixture containing Alsike Clover would better advance the statutory goal of environmental quality, and at least one of Code 512's stated purposes of reducing soil erosion by wind and/or water. The fact that Moechnig was required to balance those competing interests in order 'to optimize environmental benefits,' 16 U.S.C. § 3839aa, clearly demonstrates the decision he ultimately made was susceptible to policy analysis and thus the type of decision Congress meant to shield from judicial second-guessing. A federal employee implementing EQIP at the local, operational level must have the discretion to balance environmental protection and cattle production in order for the program to be worth the government's significant investment. . . Moechnig's job required him to balance protecting the environment with providing nutritious cattle forage, while at the same time being cognizant of the cost to the Herdens and the federal government. We therefore conclude this case involves the type of discretionary decision Congress meant to shield from judicial second-guessing."
 
    Three Justices dissented saying, ". . .Moechnig's decision in this case is not the type of decision Congress intended to shield from suit. Decisions are not shielded from suit merely because it is possible to identify policy issues behind the government program at issue. Rather, there must be 'real and competing policy considerations implicated,' C.R.S. ex rel. D.B.S. v. United States, 11 F.3d 791, 802 (8th Cir. 1993), at the general level of decision-making challenged in the lawsuit. This 'is what separates' protected from unprotected conduct. Id. It is our task to carefully distinguish those cases involving meaningful policy considerations from cases like this, that bear only the superficial trappings of such considerations. . . Moechnig's limited authority did not extend to the type of discretion Congress intended to shield from suit."
 
    Access the complete opinion and dissent (click here). [#Agriculture, #Land, #CA8]

Friday, August 9, 2013

NRDC v. County Of Los Angeles

Aug 8: In the U.S. Court of Appeals, Ninth Circuit, Case No. 10-56017. On Remand From The United States Supreme Court [In Los Angeles Cnty. Flood Control Dist. v. Natural Res. Def. Council, Inc., 133 S. Ct. 710 (2013), See WIMS 1/8/13].
 
The Appeals Court explains, Plaintiffs-Appellants Natural Resources Defense Council and Santa Monica Baykeeper (collectively, the Plaintiffs) filed suit against the County of Los Angeles and the Los Angeles County Flood Control District (collectively, the County Defendants) alleging that the County Defendants are discharging polluted stormwater in violation of the terms of their National Pollutant Discharge Elimination System (NPDES) permit, issued pursuant to the Federal Water Pollution Control Act (the Clean Water Act, Act, or CWA), 86 Stat. 816, codified as amended at 33 U.S.C. §§ 1251, et
seq.
 
    The district court granted the County Defendants' motion for summary judgment, reasoning that Plaintiffs failed to prove that any individual defendant had discharged pollutants in violation of the Clean Water Act, where Plaintiffs' only evidence of violations was monitoring data taken downstream of the County Defendants' (and others') discharge points, as opposed to data sampled at the relevant discharge points themselves.
 
    On appeal, the Ninth Circuit affirmed the district court's judgment in part and reversed in part. Natural Res. Def. Council, Inc. v. Cnty. of L.A., 673 F.3d 880 (9th Cir. 2011) [See WIMS 3/11/11]. On January 8, 2013, the Supreme Court reversed our judgment and remanded this case to us for further proceedings. L.A. Cnty. Flood Control Dist. v. Natural Res. Def. Council, Inc., 133 S. Ct. 710 (2013). On February 19,
2013, the Ninth Circuit ordered the parties to file supplemental briefs addressing the implications of the Supreme Court's ruling.
 
    The Appeals Court rules, "Having considered the Supreme Court's ruling, the responses of the parties in their supplemental briefs, and other matters noted herein, we now conclude that the pollution exceedances detected at the County Defendants' monitoring stations are sufficient to establish the County Defendants' liability for NPDES permit violations as a matter of law. Accordingly, we once again reverse the district court's grant of summary judgment in favor of the County Defendants, and remand to the district court for a determination of the appropriate remedy for the County Defendants' violations."
 
    In conclusion of its reverse and remand the Ninth Circuit says, "Because the results of County Defendants' pollution monitoring conclusively demonstrate that pollution levels in the Los Angeles and San Gabriel Rivers are in excess of those allowed under the Permit, the County Defendants are liable for Permit violations as a matter of law. This case is remanded to the district court for further proceedings consistent with this opinion, including a determination of the appropriate remedy for the County Defendants' violations."
 
    Steve Fleischli, senior attorney and director of NRDC's national water program commented on the decision saying, "Today's influential victory once again confirms Los Angeles County's legacy of Clean Water Act violations. No longer can the County sit idle and let persistent pollution problems sicken swimmers in Southern California. Today, Los Angeles residents and visitors alike can celebrate a future with cleaner water, knowing that the County is legally obligated to get to work to address its pollution problem, and protect people and water quality. Luckily, we know there are a range of green infrastructure solutions available to ensure this pollution is addressed."

    Liz Crosson, executive director of Los Angeles Waterkeeper said, "This opinion is a turning point for all of Los Angeles. Stormwater runoff is the number one source of pollution in Los Angeles' rivers and beaches and LA County is the largest discharger of stormwater. Holding LA County responsible for its pollution and working with them to find region-wide solutions is the biggest victory we could imagine."

    Access the complete opinion of the Ninth Circuit (click here). Access the release with background information from NRDC (click here).  [#Water, #SupCt, #CA9]