Wednesday, February 24, 2010

Gintis v. Bouchard Transportation Co.

Feb 23: In the U.S. Court Appeals, First Circuit, Case No. 09-1717. In this case, a fuel barge owned and operated by defendants discharged a substantial amount of oil into the waters of Buzzards Bay in southeastern Massachusetts. Plaintiffs are owners of residential waterfront property on the bay who brought suit as individuals and as members of a proposed class. The district court denied class certification, but the Appeals Court said, ". . .because the court did not subject the parties' contentions to the plenary analysis that precedent requires, we vacate the judgment and remand."
 
    The  Appeals Court provided more detail and said, "It is enough to say here that Bouchard's arguments in this appeal appear to show that substantial and serious common issues would arise over and over in potential individual cases. Indeed, the only apparent mitigation of this prospect of duplicative litigation lies in the possibility that not many individual actions would be brought if separate actions were the only course, and this implicates the second condition for certification under paragraph (3), that class litigation be
superior to a string of individual plaintiffs going alone. While superiority is a separate base to be touched, it is addressed by many of the considerations that inform a trial court's judgment call about how clearly predominant the common issues must be. . .
 
    Here there is evidence that may well go to the very reason for Rule 23(b)(3), mentioned before (i.e., to make room for claims that plaintiffs could never afford to press one by one), since the record contains one estimate that potential individual recoveries are probably in the $12 to $39 thousand range. Given the elements of injury, causation and compensation on which Bouchard intends to join issue, there is a real question whether the putative class members could sensibly litigate on their own for these amounts of damages, especially with the prospect of expert testimony required. Like predominance, the issue of superiority is thus a serious one in these circumstances and should be addressed thoroughly."
 
    Access the complete opinion (click here).

Wednesday, November 25, 2009

Boston & Maine Corp. v. Massachusetts Bay Transportation

Nov 24: In the U.S. Court of Appeals, First Circuit, Case No. 09-1185. The Appeals Court explains that on June 30, 1983, the Boston and Maine Corporation (B&M), a railroad operator, was discharged from bankruptcy by a Consummation Order stating that it was "free and clear of all claims." The Order was pursuant to § 77 of the Bankruptcy Act of 1898, 11 U.S.C. § 205 (repealed 1978). B&M was the operator of what is now known as the MBTA Commuter Rail Maintenance Facility (the Terminal), a thirty-four-acre railroad terminal in the greater Boston area used for refueling diesel trains. In 1983, the Terminal was owned by the Massachusetts Bay Transportation Authority (the MBTA), having been purchased by the MBTA from B&M in 1976; B&M had operated the Terminal under bankruptcy protection from 1970 to June 1983 and had owned the Terminal since the late 1920s. B&M continued to operate the Terminal under an agreement with and for the benefit of the MBTA until December 31, 1986.

The MBTA asserted no claims against B&M regarding environmental matters before B&M's June 1983 discharge from bankruptcy, pursuant to the Consummation Order. The MBTA did, however, assert a claim on May 4, 2004, almost 21 years later, against B&M. The claim was for 95 percent of $15,340,810 for past costs and 95 percent of all future costs, as contribution, under state environmental law, the Massachusetts Oil and Hazardous Material Release Prevention and Response Act (Chapter 21E), for certain cleanup activities the MBTA had undertaken at the Terminal.

The Appeals Court ruled, "We hold that the MBTA's contribution claims under Chapter 21E for contamination prior to the 1983 discharge from bankruptcy are barred as a matter of law by the Consummation Order. We reverse and direct entry of judgment on these claims for B&M." Further the Appeals Court concluded, "Both sides have been ably represented by counsel; the facts and the law require rejection of the MBTA's arguments. The MBTA's contribution claims arising out of pre-June 30, 1983, conduct by B&M are barred by the Consummation Order, so B&M is entitled to an order enjoining the MBTA from pursuing claims for investigation or remediation costs for contamination at the Terminal occurring before June 30, 1983."

Access the complete opinion (
click here).

Thursday, October 29, 2009

Nkihtaqmikon v. Imson

Oct 28: In the U.S Court of Appeals, First Circuit, Case No. 08-2122. The appeal is the second in continuing litigation by a group of members of the Passamaquoddy Tribe called Nulankeyutmonen Nkihtaqmikon (NN) -- the phrase means "We Protect the Homeland," -- to challenge a Bureau of Indian Affairs (BIA) decision which approved a lease of a plot of Passamaquoddy land for the construction and operation of a liquefied natural gas (LNG) facility, contingent on Federal regulatory approval being obtained from the Federal Energy Regulatory Commission (FERC).

Based on a previous ruling by the Appeals Court in this case that the "exhaustion of agency remedies was 'mandatory' under governing precedent," the district court on remand dismissed the case -- leaving NN to pursue its internal Interior Department appeals before resuming (if necessary) litigation in the district court.

As stated by the Appeals Court, NN's main argument against the prior decision is that "unless a statute requires exhaustion, judicial review of agency action under the APA, applicable where no other statutory channel of review is provided, does not require exhaustion unless there is both internal agency review available and the final agency action is rendered inoperative during such review."

The Appeals Court rules that the NN "attack is foreclosed by our mandate unless our earlier decision was plainly wrong and following it would cause a serious injustice. Neither condition has been satisfied. . . None of these developments affects our analysis in the present appeal. The district court's judgment is affirmed."

Access the complete opinion (
click here).

Monday, October 26, 2009

Rhode Island Fishermen's Alliance v. Rhode Island DEM

Oct 23: In the U.S. Court of Appeals, First Circuit, Case No. 08-2390. The case involves regulations which imposed restrictions on lobster-trap allocations for Rhode Island waters. The challenge to them centers on the Rhode Island Department of Environmental Management (DEM's) alleged use of "retroactive control dates" in composing the regulatory scheme.

According to the Appeals Court, "This appeal brings us face to face with two exotic creatures: the American lobster and a state-law claim that may or may not contain an embedded federal question sufficient to ground a claim of original jurisdiction under 28 U.S.C. § 1331 (commonly known as "federal question" jurisdiction). Cases of this sort require courts to venture into a murky jurisprudence. The answers are rarely black or white but, rather, more often doused in varying shades of gray. The difficult jurisdictional question presented here is no exception."

The underlying case began as a state-court challenge to regulations promulgated by the DEM. Those regulations imposed restrictions on lobster-trap allocations for Rhode Island waters. The challenge to them centers on the DEM's alleged use of retroactive control dates in composing the regulatory scheme.
The Court explains that a "control date" is "a cut off date for potential use in establishing eligibility criteria for future access to a fishery." Neither the relevant statute nor the challenged regulation, however, defines the term "retroactive control date." The plaintiffs aver that the DEM employed "retroactive control dates" by limiting, in 2006, fishermen's future access to fishing resources based on each fisherman's documented catch during 2001-2003.
The DEM thought that it was obliged to adopt the retroactive control dates by federal law. Accordingly, it removed the case to the federal district court. The plaintiffs moved to remand, but the district court refused to relinquish jurisdiction. The court subsequently granted summary judgment in favor of the defendants. The Appeals Court said, "After careful consideration of the plaintiffs' ensuing appeal, we agree that the district court appropriately exercised federal question jurisdiction over the case." Accordingly, the Appeals Court affirmed both the district court's denial of the plaintiffs' motion to remand and its grant of summary judgment in favor of the defendants.

Access the complete opinion (
click here).

Friday, March 6, 2009

Martex Farms, S.E. v. Environmental Appeals Board

Mar 5: In the U.S. Court of Appeals, First Circuit, Case No. 08-1311. Martex Farms, S.E., one of the largest commercial farms in Puerto Rico, appealed a final decision and order of U.S. EPA's Environmental Appeals Board (the Board), which held Martex liable for numerous violations of the Federal Insecticide, Fungicide, and Rodenticide Act (FIFRA), 7 U.S.C. § 136 et seq. The Appeals Court affirmed the Board's decision in full, as to both liability and penalty.

Because Martex uses pesticides as part of its agricultural methods, it is subject to the Worker Protection Standard (WPS), 40 C.F.R. pt. 170, which is enforced by EPA. The WPS is intended to reduce the risk of illness and injury to workers and handlers who are exposed to pesticides during the course of employment. In January 28, 2005, EPA filed an administrative complaint against Martex alleging 336 violations of FIFRA by Martex. The EPA accused Martex of failing to meet several rather common sense and straightforward WPS requirements, including: (1) displaying information for workers and handlers regarding pesticide application; (2) providing decontamination supplies for workers and handlers in easily accessible locations; and (3) providing handlers with personal protective equipment. Martex subsequently appealed the decisions of an administrative law Judge and the Board.

The Appeals Court said, "Our review of the Board's conclusions is highly deferential. By statute, we will sustain the Board's order 'if it is supported by substantial evidence when considered on the record as a whole.' 7 U.S.C. § 136n(b). In addition, we will sustain the EPA's interpretation of its own regulations unless that interpretation is 'arbitrary, capricious, or otherwise plainly impermissible.'"

On one of the primary arguments, i.e. Substantial Evidence Claim, the Appeals Court said, "Martex also contests the substantive findings of liability made below. The crux of Martex's argument in this regard is that its farms contain abundant sources of water, such as lakes, streams, and fruit washing facilities, which are sufficient to comply with the WPS standards. However, neither in its brief nor at oral argument did Martex allege that these water sources were grouped together with the required soap and paper towels, or that they were available within 1/4 mile of the work sites, as required by regulations. Indeed, substantial evidence in the record points to the opposite conclusion. We therefore see no basis for reversal as to the substantive violations."

On the penalty issue, the Appeals Court said, "The maximum statutory fine for each violation of FIFRA committed by Martex is $1,100. The Board conducted a deliberate and rigorous evaluation of the proper penalty as to each violation, never assessed an amount greater than $1,100 for any violation, and in several cases assessed a much lower penalty. One of the factors it considered was Martex's ability to pay the proposed penalty. We therefore find no error."

Access the complete opinion (
click here).

Monday, February 9, 2009

Sierra Club v. Wagner (USDA)

Feb 6: In the U.S Court of Appeals, First Circuit, Case No. 08-1978. The Sierra Club, along with two other conservation groups including Center for Biological Diversity and Wilderness Society (Sierra Club), challenged the U.S. Department of Agriculture's (USDA's) Forest Service's approval of two forest resource management projects in the White Mountain National Forest (Forest or WMNF) -- the Than Forest Resource Management Project (Than Project) and the Batchelder Brook Vegetation Management Project (Batchelder Project). The district court decision, upheld the Forest Service.

Following adoption of a 2005 plan for the forest that included "inventoried roadless areas" (IRAs), the Forest Service proposed to allow timber harvesting of approximately 929 acres in the Than project, creating up to 231 acres of early successional habitat. The proposal would allow some existing roads to receive maintenance or reconstruction, and a 500 foot section of new road was planned. In an environmental assessment indicating certain possible adverse effects of the Than Project on the Wild River Inventoried Roadless Area -- including sediment inputs to streams, some soil disturbance, and effects on stream temperature -- the Forest Service concluded that the project would not significantly alter the character of the area or the qualities which qualified it for inclusion in the inventory. A similar finding was delivered for the Batchelder project. The groups requested a stay pending appeal which was denied by the Appeals Court, but the Appeals Court expedited the case.

The Appeals Court affirmed the district court decision and concluded, ". . . the evident intent to allow public comment on FONSI [Finding of No Significant Impact] findings seems to have been satisfied here in spades. An agency that adopts a FONSI without seeking input can be expected at least to accept comments before acting on the merits of a decision; but here both EAs were circulated in draft form and comments solicited even before any FONSI was finally adopted. Why this does not satisfy the purpose of the thirty day rule Sierra Club does not explain."

Access the complete opinion (
click here).

Monday, December 22, 2008

Town of Marshfield v. Federal Aviation Administration

Dec 18: In the U.S. Court of Appeals, First Circuit, Case No. 07-2820. The Federal Aviation Administration (FAA) has authority to prescribe aircraft approach and departure patterns in order to minimize noise and ensure safety. In 2002, the agency approved a change in the runway layout of Logan Airport in Boston to include a new runway and, at the same time, began a study of improved noise abatement measures. The outcome was the "Boston Overflight Noise Study" (BONS), conducted with advice and participation by various organizations.

In implementing BONS, FAA adopted some of the report's "phase I" measures for the rerouting of aircraft to increase use of Logan approaches and departures over the ocean with shoreline crossings at higher altitudes. In finding that these measures required no environmental assessment (EA) or environmental impact statement (EIS), the FAA relied upon noise studies to measure the impact on surrounding communities. The Town of Marshfield, MA, opposed the new phase 1 measures, arguing that the new flight patterns would adversely affect its residents and sought review of the FAA's decision claiming violations of the National Environmental Policy Act (NEPA), the Federal Advisory Committee Act (FACA), and the FAA's own rules.

In analyzing the NEPA issues and denying the petition for review, the Appeals Court determined that FAA's noise exposure finding "is adequately based." Additionally, the Appeals Court said, "Marshfield seems to assert that an EA or EIS was required so long as the phase 1 measures were 'highly controversial,' which it regards as covering any introduction of new noise over inhabited areas and with opposition by a town or city. Although FAA Order 10501.1E, para. 304, uses the phrase 'highly controversial,' it makes clear that controversy is not decisive but is merely to be weighed in deciding what documents to prepare."

Access the complete opinion (
click here).

Monday, December 8, 2008

Fitzgerald v. Harris

Dec 5: In the U.S. Court of Appeals, First Circuit, Case No. 08-1306. The case raises the issue of whether a Maine statute governing the management of a state administered river, the Allagash Wilderness Waterway (AWW) is preempted by certain sections of a Federal statute, the Wild and Scenic Rivers Act (WSRA). Plaintiffs Charles FitzGerald and Kenneth Cline (collectively FitzGerald) are avid canoeists who sued Willard R.Harris, Director of the Maine Bureau of Parks and Lands, seeking a declaration that the Maine statute is preempted by Federal law, as well as injunctive relief against the enforcement of the Maine statute.

According to the Appeals Court, the Plaintiffs essential complaint is that the provisions of Maine's statute maintaining certain bridges and public access points to the AWW destroy the "wild" character of the river. The Appeals Court said, "There have been, to our knowledge, no prior federal courts of appeals decisions squarely involving claims of preemption of state statutes by the WSRA, which was enacted in 1968." The district court granted Harris's motion to dismiss under Fed. R. Civ. P. 12(b)(6), adopting a magistrate judge's recommended decision holding that the Maine statute is not preempted by federal law. The Appeals Court affirmed the district court dismissal.

In part, the Appeals Court said, "Because both the NPS [National Park Service] and the ACE [Army Corps of Engineers] approved Maine's plans for the Henderson Brook Bridge, it cannot be said that the Maine statute authorizing the permanent bridges over the AWW is preempted by federal agency action."


Access the complete opinion (click here).

Friday, November 7, 2008

SBT Holdings v. Town of Westminster

Nov 6: In the U.S. Court of Appeals, First Circuit, Case No. 08-1512. Plaintiffs SBT Holdings, LLC, and its owners, Brian, Thomas, and Susan Foley, undertook a condominium real estate development project in the Town of Westminster, Massachusetts. After delays caused by environmental regulation demands by the Town, plaintiffs sued the Town, the Town of Westminster Conservation Commission, and various individuals. Suit was brought under 42 U.S.C. § 1983 alleging that the defendants, in violation of plaintiffs' equal protection rights, intentionally obstructed the development by taking certain actions, actions which a state court had found to be in violation of state law and in bad faith.

The district court dismissed plaintiffs' complaint for failure to state a claim. It held that the complaint failed to specify similarly situated others who were treated differently, a necessary element in an equal protection case. [See: SBT Holdings, LLC v. Town of Westminster, 541 F. Supp. 2d 405, 413 (D. Mass. 2008)]. The Appeals Court reversed the dismissal and remanded the case for further proceedings consistent with the opinion.

In its opinion the Appeals Court said, "Defendants' argument overlooks the relevant Massachusetts law. Since at least 1981, Massachusetts courts have recognized that conservation commissions are amenable to suit. See Hamilton, 425 N.E.2d at 366 (noting that local authorities may impose by bylaw or ordinance wetlands protections that are more stringent than state standards under section 40, but that 'where a taking is caused by the accomplishment of that purpose, it is the local authority which would bear the liability'). In addition, there are numerous cases where conservation commissions are parties and Massachusetts state courts dismissed claims for damages against them, but not on grounds they are not amenable to suit. . . Such actions have not been limited to takings claims and have included actions for damages."

Access the complete opinion (
click here).

Wednesday, June 11, 2008

Boston Gas Company v. Century Indemnity

Jun 10: In the U.S. Court of Appeals, First Circuit, Case No. 07-1452. As explained by the Appeals Court, this is a dispute between Boston Gas Company (Boston Gas), the largest provider of natural gas in the New England area, and one of its insurers, Century Indemnity Company (Century). Before natural gas became the primary source of energy in New England, Boston Gas produced gas fuel at facilities called manufactured gas plants (MGPs). The MGPs created gas by heating coal in large ovens, generating gas which was then purified and piped out for use. The process also produced a variety of byproducts, including ash, drip oil, tar and coke. Many are non-biodegradable and some are deemed carcinogenic, and they now contaminate the ground and water around many former MGP sites; further, MGPs were often sited near waterways which were contaminated in turn. Contamination has been discovered at twenty-nine former Boston Gas MGPs; this case concerns only one of those sites, located in Everett, Massachusetts.

At trial, the jury awarded Boston Gas over $6.1 million in past remediation expenses; the district court also issued a declaratory judgment obligating Century to pay all future costs associated with the investigation and environmental cleanup of the Everett site. Century now appeals on multiple grounds from the district court's judgment.

Among other conclusions, the Appeals Court said, "We conclude that as to future costs, Century cannot reargue matters that have already been decided, but conversely, Boston Gas cannot properly seek to recover for future costs spent purely to remediate its own property where no threat exists of contamination outside the site. The district court will be able to determine the scope of litigation when a dispute arises, using doctrines like collateral estoppel, waiver, and the like to prevent relitigation of matters that have been, or could have been, decided.

"By its literal terms the declaratory judgment could be read to encompass costs that are not recoverable under Century's policy; the district court may not have considered that requiring Century to indemnify Boston Gas for all costs related to 'investigation and cleanup' may apply more broadly than it intended. On remand an adjustment is needed in order to clarify that Boston Gas' entitlement extends only to costs incurred for remediation not barred by the terms of Century's policies and consistent with the findings of the jury." Additionally, the Appeals Court certified three questions concerning allocation of liability to the Massachusetts Supreme Judicial Court for its consideration.

Access the complete opinion (
click here). Access the certified order (click here).

Friday, April 11, 2008

Esso Standard Oil Co. v. Lopez-Freytes

Apr 10: In the U.S. Court of Appeals, First Circuit, Case No. 07-1218. The case is an appeal from the Puerto Rico district court's issuance of an order permanently enjoining the defendants -- several members and officials of the Puerto Rico Environmental Quality Board (EQB) -- from imposing a $76 million fine on the plaintiff, Esso Standard Oil Company (Esso). On appeal, the defendants argue that the district court should have abstained from exercising jurisdiction pursuant to the "Younger abstention doctrine" and, in any event, they say the court erred in concluding that there existed bias necessitating the imposition of the injunction. The Appeals Court affirmed the district court's order.

The case involves an underground fuel storage system at a service station in Barranquitas, Puerto Rico. Beginning in 1979, Esso had leased storage tanks and other fuel supplies to the station and in 1991 replaced the entire underground storage system. Between August 1998 and October 1999, the EQB issued three orders directing Esso to test the fuel storage system. Those investigations revealed and recovered about 550 gallons of spilled fuel.

Despite Esso's efforts to comply with the EQB's directives, the EQB issued a show cause order on May 21, 2001, proposing a $76 million fine against Esso for its failure to notify the EQB upon initial discovery of the fuel leakage and its failure to timely investigate, clean up, and remedy the harm. In September 2002, the EQB initiated hearings on this proposed penalty against Esso. The hearings were marked by contentious debates and allegations of severe bias.

The Appeals Court said, "Not only is the defendants' argument utterly unsupported by the law, but we have already rejected it. . . [in a previous appeal] Last time, we properly concluded that the bias stems from the potential financial benefit to the EQB's budget as a result of an imposed fine. . . The district court concluded that the contractual relationship between the EQB and the Hearing Examiners exhibited structural bias on account of both the method by which the Hearing Examiners receive assignments and because of the particularities within the pay structure. We agree. . . This case involves evidence that the EQB's
decisionmaking process with respect to Esso is constitutionally infirm. The serious harm inflicted upon Esso is not outweighed by the EQB's concern that this injunction may alter the perceived strength of the EQB's governance. . . "

Access the complete opinion (
click here).

Wednesday, April 9, 2008

Commonwealth of Massachusetts v. U.S. NRC

Apr 8: In the U.S. Court of Appeals, First Circuit, Case Nos. 07-1482, 07-1483. In the case the Commonwealth of Massachusetts wants to make sure that the U.S. Nuclear Regulatory Commission (NRC) will consider the Commonwealth's safety concerns about treatment of spent fuel rods before the NRC decides whether to renew the operating licenses of two nuclear energy plants -- the Pilgrim plant in Plymouth, MA; and the Vermont Yankee plant in Vernon, VT, which is within ten miles of the Massachusetts border. The licenses were originally issued in 1972 and will expire in 2012; the re-licensing proceedings have been initiated and are ongoing.

Massachusetts indicates that old assumptions about safe storage of spent fuel rods -- on which the NRC has relied since at
least the early 1970s -- no longer hold. They claim that more recent studies and changed circumstances indicate an increased risk that the plants' method of storing spent fuel rods will lead to an environmental catastrophe. Massachusetts also raises its concern that the plants' method of storing spent fuel leaves the plants vulnerable to terrorist attack.

Both sides agree that the safety issues raised are deserving of careful consideration. Both sides also agree that the Massachusetts is by law permitted to raise its various concerns by "some path" and to obtain judicial review of any NRC decision that adversely affects its interests in this matter. The question argued in this case is whether Massachusetts has, "from the regulatory maze, chosen the correct path for doing so." Massachusetts insists it has chosen the appropriate path, indeed, the only one available to it -- i.e. participating directly in the re-licensing proceedings as a party.

The NRC says the Commonwealth has chosen the "wrong path, indeed, one precluded by its regulations." The Agency also says that another option is available, is the proper path to be followed, and will adequately protect the state's interests.
According to the NRC, the Commonwealth must abandon its attempt to attain formal "party" status in the licensing proceedings and instead seek to participate in those proceedings as an "interested governmental entity."

The First Circuit rules that Massachusetts "has chosen the wrong path in seeking to raise the safety issues as a party in the licensing proceedings and deny its petition. We also bind the NRC to its litigation position. . . this leaves the Commonwealth free to follow the NRC's preferred path if it so chooses. To the extent the Commonwealth seeks an order from this court interfering with the NRC's ongoing re-licensing proceedings by imposing decision-making timetables on the agency, we issue a very brief stay but otherwise decline to issue such relief."

Access the complete opinion (
click here).

Monday, January 21, 2008

Nascimento v. Preferred Mutual Insurance Co.

Jan 18: In the U.S. Court of Appeals, First Circuit, Case No. 07-1792. Jack Nascimento appeals a district court judgment from the State of Massachusetts declaring that Preferred Mutual Insurance Company (Preferred Mutual) is under no contractual obligation to defend him in an environmental liability suit brought against him by his neighbors, Tiago and Maria Leal. The Appeals Court said, "We affirm, albeit on slightly different grounds than those relied upon by the district court."

On March 25, 2005, Nascimento placed a claim with Preferred Mutual requesting it to defend and indemnify him under his Commercial General Liability (CGL) policy effective from November 9, 1996 to November 9, 1997. On April 15, 2005, Preferred Mutual denied coverage under the CGL policy’s total pollution exclusion.

According to the Appeals Court, the district court based its decision solely on section f(2)(a) of the total pollution exclusion. The district court held that all of the damages claims set out in the Leal complaint involved remediation costs. Relying solely upon section (f)(2)(a), the district court held that the CGL policy excluded coverage for such "remediation damages." Nascimento, concedes that section (f)(2)(a) bars remediation damages, however, he says the Leal complaint seeks "both remediation and non-remediation damages."

Following the district court’s decision in this case and during the pendency of this appeal, the Massachusetts Supreme Judicial Court decided McGregor, in which "it interpreted the same total pollution exclusion clause as appears in Nascimento’s policy." Under McGregor, the total pollution exclusion in Nascimento’s CGL policy bars "all" of the Leals’ claims. McGregor holds that once the oil becomes a pollutant, the total pollution exclusion of the CGL policy is triggered and coverage for remediation and non-remediation claims is barred.

The Appeals Court concluded, "In this case, the home heating oil leaked from the UST Nascimento continuously used. The leak caused the pollution damage for which the Leals seek reimbursement. Therefore, section f(1)(a) of the total pollution exclusion was triggered, and Preferred Mutual has no duty to defend Nascimento in the Leal suit."

Access the complete opinion (click here).